Edificio Ágora, Spain
Valencia,
Spain
Multi-function centre created to resemble the helmet of a conquistador; arch-supported steel supporting structure; foldable glass roof with a lamellae-type construction
Height: 80 m
Width: 65 m
Length: 100 m
Construction period: 2008 - 2009
Architect: Santiago Calatrava
U.T.E. Agora, Valencia:
Augescon, Lindner, Estrumaher
Location
The Project
##project.applications.text##
A huge birdcage scaffold on the basis of PERI UP Rosett provided safe access ways and working areas for subsequent site activities up to a height of nearly 80 m.
The distinct and clear structure of the modular scaffold is self-explanatory and guarantees fast and safe assembly.
With its modular and flexible design features, PERI UP Rosett Flex scaffolding system could easily be adapted to suit the complex forms.
After completion of the steel fin construction, the scaffold was continuously modified and adapted for subsequent work operations.
During the construction phase, the inside area of the future multi-functional hall was almost completely filled with PERI UP Rosett scaffolding.
Buildings from Santiago Calatrava are characterized by their elegant sculptural designs – the Edificio Ágora continued this tradition.
A huge birdcage scaffold on the basis of PERI UP Rosett provided safe access ways and working areas for subsequent site activities up to a height of nearly 80 m.
The distinct and clear structure of the modular scaffold is self-explanatory and guarantees fast and safe assembly.
With its modular and flexible design features, PERI UP Rosett Flex scaffolding system could easily be adapted to suit the complex forms.
After completion of the steel fin construction, the scaffold was continuously modified and adapted for subsequent work operations.
During the construction phase, the inside area of the future multi-functional hall was almost completely filled with PERI UP Rosett scaffolding.
Buildings from Santiago Calatrava are characterized by their elegant sculptural designs – the Edificio Ágora continued this tradition.
##project.requirementsAndSolutions.headline##
Carlos Gil
Project Manager
The PERI scaffold solution adapted perfectly to the complex geometry and construction progress. As a result of this, all operational steps could be safely carried out, which also led to substantial time savings.